| 项目名称:香河开发区四星级安平大厦续建项目
项目内容:拟在香河开发区已开始兴建一座集餐饮、办公、会议、综合商住、健身休闲功能于一体的四星级安平大厦,设计建筑面积18000平方米.
投资估算及资金来源:该项目计划总投资1000万美元,目前已完成纵深30米的地基处理和一层地下室,投入资金100万美元,欲寻求域外资金900万美元。
建设条件:香河开发区隶属于河北省香河县,北接北京通州,南邻天津武清,是唯一一家“一脚跨三省市”的省级开发区,是“大北京”经济圈战略区域的核心。香河开发区交通十分便利,距首都国际机场56公里,天津新港106公里,103国道穿区而过,北京市938路公交车直达区内,京沈高速公路在开发区周边设有两个出口。国内最大的人文景观----第一城就座落在香河开发区内。该城由中信国安公司投资兴建,总投资达30亿元人民币。目前该项目已建成圆明园景区、阳光长廊、国际会议中心、荷花池、老北京文化区、灯光高尔夫球场等多处景点。安平大厦就选址在第一城对面,与第一城一路之隔,地理位置十分优越。
经济效益分析:项目建成后,可实现年收入800万美元,利润300万美元,税金80万美元,投资回收期3.5年。
合作方式:合资、合作
客户服务:(010)82628888-6786 点击此处在线咨询或留言
免责声明:该栏目所展示的项目信息其真实性、准确性和合法性由信息发布人负责。新浪网不提供任何保证,并不承担任何法律责任。详细内容请见《法律声明》
1.Project name: Project To Be Continued of Anping Four-star Mansion.
2.Project content: Anping four-star mansion in Xianghe Development Zone with the function of catering, conference, accommodation has been finished. Its area is 18000 sq. meters.
3.Estimation of Investment and Capital Source: The total investment is $ 10 million. At present, 30 meter-depth of ground and one - floor basement have been finished.
4.Construction Condition: Xianghe Development Zone, administrated by Xianghe county of Hebei province, connects Tongzhou of Beijing to the north, adjoins Wuqing of Tianjin in the south. It is an only provincial development zone which " the area links to one province and two cities ". The Development Zone is the center part of " large Beijing ". The traffic in this area is very convenient. The Zone is 56 kilometers to The Capital International Airport, 106 kilometers to The New Port. 103 national road and Beijing No. 938 bus line run through the zone. There are two exits of Beijing-Shenyang expressway around Development Zone. Domestic greatest cultural sight ------- Grand Epoch City is located in Development Zone. Grand Epoch Top City was invested by CITIC Guoan Company, and its investment is up to RMB 3 billion Yuan. By now this project has already built up many beautiful spots such as Yuanmingyuan Site, Sunshine Corridor, International Conference Center, Lotus Pond, The Reappearance of old Beijing, Light Golf Court etc.
5.Analysis of Economic Benefits: After the project was built up, annual income of $ 800 million is available with profit of $ 300 million, tax of 80 million. The investment recoverable period is 3.5 years.
6.Cooperation Form: cooperation, joint venture
|